The expanded hospital features
- New urgent care
- 32 bed inpatient and maternity unit
- 2 operating theatres and recovery spaces
- Day medical centre with imaging and pathology services
Installation includes
- Oil free medical breathing air compressor system
- Medical suction system.
- CSSD compressor system
- Tool air manifold system
- Medical air back up manifold system
- Medical carbon dioxide manifold system
- Medical nitrous oxide system
- Supply, install and commission medical gas reticulation complete with valve isolation boxes and tool air boxes
- Connection to medical pendants
- Supply and install medical gas outlets
- Supply and install medical gas alarm system
- Supply and install BMS interface
- Connection to medical pendants
- Installed, tested and commissioned to AS2896-2021
